Project Type: CCS Facility
Coyote Clean Power
March 1, 2023The Coyote Clean Power Project plans to construct a 280 MW of clean power whilst capturing and storing the CO2. The design is based on the NET Power system, which combusts fuel with oxygen, as opposed to air, and uses supercritical carbon dioxide as a working fluid to drive a turbine instead of steam. This […]
Coyote Clean Power
October 24, 2022The Coyote Clean Power Project plans to construct a 280 MW of clean power whilst capturing and storing the CO2. The design is based on the NET Power system, which combusts fuel with oxygen, as opposed to air, and uses supercritical carbon dioxide as a working fluid to drive a turbine instead of steam. This […]
Fortum Oslo Varme
October 24, 2022Norway’s largest waste-to-energy plant has secured funding that will enable capture and storage of 400 000 tonnes of CO2. Fortum Oslo Varme has chosen TechnipFMC as its main contractor and Shell as the supplier of the CO2 capture technology. CO2 will be separated at the incineration plant, liquefied and temporarily stored in tanks at Klemetsrud. This project […]
