Project Tundra

CCS Facility Minnkota Power Cooperative Milton, North Dakota USA Power Generation 2026 https://www.projecttundrand.com/

Project Tundra aims to retrofit the Milton R. Young Power Station with CO2 capture technology to capture 4 million tonnes per annum of CO2. Project Tundra has received all necessary permits for the safe geologic storage of the captured CO2 near the Milton R. Young Station site. Project Tundra is in the advanced engineering and design phase and is expected to cost $1.45 billion. If the project moves ahead, construction could begin as early as 2023.