Project Type: CCS Hub

GOCO2 Project

September 25, 2024

The objective of GOCO2 project is to develop an investment programme to capture CO2 on industrial sites and transport it by pipeline to the Montoir-de-Bretagne terminal for permanent geological storage. The estimated capacity is of 2.6 million tonnes per year by 2030. Convinced of the benefits of a collective approach, the partners in the GOCO2 […]

Origins

September 25, 2024

Origins is a permanent storage hub that will be operational as early as 2025. Enhance Energy estimates that up to 20 million tonnes per year of CO2 can be captured, transported, and permanently sequestered. 20 Mtpa CO2 2025 Canada Clive, Alberta CCS Hub

Wolf Hub

September 25, 2024

The sequestration hub will serve large facilities in Alberta’s Industrial Heartland that are seeking an independent, safe, and timely CO₂ sequestration solution. Initial hub volumes are expected to be between two to three million tonnes per annum (MTPA) with significant expansion capability to support current and future requirements of Fort Saskatchewan area businesses. The partners […]

ACTL Edmonton Connector

September 25, 2024

The ACTL Edmonton Connector will extend the existing Alberta Carbon Trunk Line (ACTL) system through the core of the Alberta Industrial Heartland and into the Edmonton Region to support existing and new industrial facilities in reducing their greenhouse gas emissions. At full capacity, the ACTL Edmonton Connector will be capable of transporting approximately seven million […]

Pathways Alliance Foundational Project

September 25, 2024

Pathways Alliance is a collaboration between Canada’s six largest oil sands companies, representing about 95% of Canada’s oil sands production. Phase one of the project will connect 13 CCS facilities from north of Fort McMurray to the Cold Lake region to a carbon storage hub in the Cold Lake region. This will be achieved through […]

Northern Endurance Partnership (NEP)

September 25, 2024

The Northern Endurance Partnership (NEP) aims to accelerate the development of an offshore pipeline network to transport captured CO2 emissions from both Net Zero Teeside and Zero Carbon Humber to offshore geological storage beneath the UK North Sea. Around 4 million tonnes of CO2 per year from these projects will be transported and stored from 2027. […]

BP Gulf Coast CCS Hub

March 1, 2023

bp and Linde have announced plans to advance a major CCS project in Texas that will enable low carbon hydrogen production at Linde’s existing facilities. The development will also support the storage of CO2 captured from other industrial facilities – paving the way for large-scale decarbonization of the Texas Gulf Coast industrial corridor. As part […]

Ohio Hub

March 1, 2023

US Steel, Equinor and Shell are teaming up to create a collaborative carbon capture and hydrogen hub in the Ohio, West Virginia, and Pennsylvania region. Equinor and Shell plan to jointly apply for US Department of Energy funding designated for the creation of regional carbon capture and clean energy hubs to move forward. US Steel […]

3D Project

March 1, 2023

The objective of the ‘3D Project’ is threefold: demonstrate the effectiveness of the DMX process at pilot scale, implement the first industrial unit at ArcelorMittal’s site, and design a future Dunkirk North sea cluster. This cluster will be backed up by the transport and storage infrastructure developed in the North Sea by other projects such […]